View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0003359 | Path | Bug | public | 2018-03-01 16:02 | 2018-03-08 11:30 |
| Reporter | sliptonic | Assigned To | sliptonic | ||
| Priority | normal | Severity | minor | Reproducibility | always |
| Status | closed | Resolution | fixed | ||
| Product Version | 0.17 | ||||
| Target Version | 0.17 | ||||
| Summary | 0003359: Simulation of Jobs other than the first use wrong stock | ||||
| Description | If a job is created and operations added, it can be simulated correctly. If a second job is added with its own operations, the simulation will use the stock for the first job. | ||||
| Steps To Reproduce | Create a job, add operations. Create s second job, add an operation Select the second job and click the simulate button. The stock is the first job stock. | ||||
| Additional Information | https://forum.freecadweb.org/viewtopic.php?f=15&t=24422&start=130#p217773 | ||||
| Tags | No tags attached. | ||||
| FreeCAD Information | |||||
FreeCAD